BACK to Church Bell Restoration
Wayne Presbyterian Church
Wayne, Pennsylvania
BRONZE BELL REMOUNTED in NEW STRUCTURAL STEEL "A" STANDS, with NEW YOKE AND WHEEL
The bell was elvated using elongated "A" stands in order to bring the bell up to the level of the louver opennings. This allows the voice of the bell to ring out from the tower.
Chime Master Systems swingnig bell ringer and striker were added and are controlled by the Chime Master Systems Millennium Cast Bell controller for the Call to Worship, Prayer Bells, Hour Strike and tolling.
Bell in new structural steel headpiece, "A" stands and wheel
|
|